Industrial Stair.
Utilsing our clients IFC model we were tasked with detailing a...
Read MoreCMD detailed a ramp for a prison, a bit more to think about on this project, all open areas had to be enclosed in so...
Read MoreCMD have detailed a large frame for a very large new build property, along with secondary steelwork, balustrading...
Read MoreCMD provided Arrgt and Detail drawings for a Maintenance Ramp.
Read MoreCMD provided detail and Arrgt drawings for the supply and installation of a roof top balustrade system located on...
Read MoreAn example of some secondary steelwork for the refurb of an existing factory for a new tenant.
Read More