Another successful project approaches completion on site, CM Design was tasked with a project to assist in the replacement of an existing belt conveyor. CM Design surveyed existing structures / equipment on site and provided Arrangement, Details and Installation Drawings for the following items:-
Conveyor Junction House structure and access stairs / platforms – 15.2 Tonnes
Rail Unloading Building – 28.3 Tonnes
External Gantry structure and access stairs / platforms – 8.6 Tonnes
Hopper Feed Conveyor structure and access ladders / platforms – 3.1 Tonnes
Pit Enclosure Structure – 7.2 Tonnes